WUHAN SUNFULL NEW ENERGY TECHNOLOGY CO., LTD. · Material Handling Business DivisionWuhan, Hubei, China · +86 181 3572 0426 · WhatsApp
BUYER GUIDE · UPDATED 2026-08-17

Reefer Container PTI and CSC Document Checklist

Understand which unit identities, safety plates, pre-trip tests, temperature records and condition photos to request.

DIRECT ANSWER

Match the exact container and cooling-unit serials to the CSC plate, PTI report, running test and photo set. Generic certificates or sample reports do not prove the condition of the unit offered.

Match identities

The container number, cooling-unit model and serial must be readable and consistent across quotation, photos, PTI and dispatch record.

Review CSC status

Check the approval plate and current examination/ACEP status applicable to transport plans.

Need a model recommendation?

Review the PTI scope

Confirm test date, technician or facility, alarms, sensors, compressor, fans, heaters, defrost and temperature performance.

Record handover condition

Use time-stamped exterior, interior, door, floor, refrigeration-unit and running-display photos before collection.

Frequently asked questions

Can a sample PTI report be accepted?

No. It must identify the exact unit.

Does a successful PTI guarantee future performance?

No, but it materially improves condition evidence at a point in time.

Editorial method

This guide separates source-backed fields, generally accepted selection practice and quotation-dependent data. It does not claim that every option applies to every model. Final decisions require the approved datasheet, local rules and a workplace assessment.

Read our content methodology →
CONFIGURATION REVIEW

Turn the operating data into a comparable quote.

Send load, lift, aisle, battery, quantity and destination. We will identify the missing technical fields.

WhatsApp
QUICK RFQ

Tell us what you need

We aim to review each complete request within one business day.