WUHAN SUNFULL NEW ENERGY TECHNOLOGY CO., LTD. · Material Handling Business DivisionWuhan, Hubei, China · +86 181 3572 0426 · WhatsApp
APPLICATION SOLUTION

Warehouse Storage Solutions for Pallet Handling

Warehouse storage solutions should align the pallet profile, rack layout, aisle clearance, lift height and movement rate before equipment quotations are compared.

DECISION INPUTS

What to confirm before comparing machines

Use the same measured operating inputs for every bidder. The goal is to compare configurations that solve the same duty, not product titles that happen to sound similar.

01Record pallet size, maximum working load, load center and target storage positions
02Map rack type, clear aisle, transfer aisle, lift height, doors and overhead limits
03Document travel distance, shift hours, ramps, floor condition and charging supply
04Ask each bidder for one layout and configuration sheet, capacity evidence, exclusions, packing and service scope
LIKE-FOR-LIKE COMPARISON

Turn pallet, rack and traffic data into one comparable storage RFQ

These fields expose configuration gaps before a headline amount or delivery promise is treated as comparable.

Decision fieldWhy it mattersWhat the RFQ should state
Load unitSets the working-capacity and rack-geometry basisPallet width, depth, height, maximum working weight, load center and overhang
Building and rackControls aisle, lift and transfer clearancesRack face, highest placement level, clear aisle, doors, columns and overhead limits
Movement profileChanges truck, battery and traffic requirementsMoves per hour, travel distance, shifts, ramps, dock work and charging windows
Acceptance evidenceKeeps different offers comparableExact model sheet, capacity evidence, layout revision, exclusions, packing and inspection scope
EVIDENCE GATE

Documents and checks to close before approval

Keep open fields visible. A product-family page or sample document is not a substitute for the exact model, project and order record.

  • One dated site-input sheet used by every bidder
  • Rack layout with clear aisle and highest placement level marked
  • Capacity or residual-capacity evidence for the quoted mast and attachment
  • Battery and charger sheet matched to the stated shift
  • Written option, packing, document, warranty and spare-parts scope
QUOTE CONTROL

Make every bidder answer the same questions

Require a dated response that names the exact model or project, configuration, exclusions, options, documents, packing, inspection scope, Incoterm and validity.

Open the RFQ framework
DIRECT ANSWERS

Questions buyers ask before an RFQ

Short answers first, with configuration boundaries made explicit.

Should the rack or forklift be selected first?

Develop them together. Pallet geometry, rack height and aisle layout determine the handling envelope, while the selected truck changes the aisle and transfer-space requirement. Freeze neither item before the combined layout is checked.

Can rated forklift capacity be used at every rack level?

No. Lift height, load center, mast and attachment can change usable capacity. Request capacity evidence for the exact quoted configuration at the highest required placement level.

What makes two warehouse storage solutions comparable?

Use the same pallet profile, storage target, building drawing, movement rate, inspection scope and delivery basis. Require every bidder to identify exclusions and open technical fields.

Is a concept layout ready for installation?

No. A concept supports early selection. The approved project still needs the agreed design basis, reviewed drawings, structural and site responsibilities, installation tolerances and acceptance records.

CONFIGURATION REVIEW

Tell us which equipment you need

Send the product type, intended use, quantity and destination. Our team will review your requirements.

WhatsApp
QUICK RFQ

Tell us what you need

We aim to review each complete request within one business day.